Case

Nacional Monte de Piedad contract review

Client:
Nacional Monte de Piedad
Year:
2024
Area:
Labor Engineering

The Challenge

Nacional Monte de Piedad faced the need to revise its collective bargaining agreement in an environment that demanded greater operational efficiency and labor cost control. The challenge was not only to reach an agreement with the union but to transform historical conditions into a more flexible model that would ensure the institution's viability without creating labor friction.

The Strategic Approach

Applying the principles of Labor Engineering, our firm designed and led a strategy focused on:

Operational Redesign:
Incorporating more flexible work schemes, including the creation of multi-tasking roles aligned with actual operations.

Cost Optimization:
Structuring agreements that generate labor efficiencies without compromising the stability of the union relationship.

Consensus Management:
Leading complex collective processes to achieve sustainable and practically executable agreements.

The Result

Through a strategic and well-structured negotiation, key results were achieved:

Labor Savings:
Reduction in operating costs through adjustments to working conditions.

Operational Flexibility:
Implementation of schemes such as multi-tasking roles and extended working hours.

Institutional Viability:
A collective bargaining agreement aligned with current needs that strengthens the organization's sustainability.

Blog

Related articles

Insights to help you understand the work environment, anticipate risks, and make clear decisions—without the noise or unnecessary jargon.
View all

Internal investigations into workplace violence: how to take action

Read article

Labor inspections and complaints: why traceability matters

Read article

Workplace violence training: what to review in your company

Read article

40-hour workweek reform in Mexico: what companies need to prepare before 2027

Read article

Time management in business: the cultural shift required by the 40-hour workweek reform

Read article
Contact

Tell us the context.

We prioritize clear and timely responses based on the complexity of the matter.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.